Introduction, What you need, Warning – NEC EXPRESS800 User Manual

Page 40

Advertising
background image

4-2 Installing the System Rack

Introduction

The steps required to prepare your rack are:

!

Unpack and inventory your rack and its system components.

!

Remove the doors and side panels from the rack to simplify the assembly
of rack components.

!

Position and level the rack(s).

!

Install one or more rack frame link kits when assembling multi-rack
systems.

!

Attach the front stabilizer when your rack is in its permanent location.

What You Need

In addition to the materials shipped to you and standard hand tools, you will
need:

!

a level for leveling the rack and an adjustable wrench to lower and secure
the leveling feet

!

an adjustable wrench or ratchet set to attach the stabilizer to the base of
the rack

!

a #2 and #3 Phillips-head screwdriver to assemble rack-mounting
hardware, and

!

if you are assembling a multi-rack system, you will need a six foot step-
ladder

!

WARNING

It is strongly recommended that two people be present when
assembling the rack and installing system components.

Advertising