Installation/performance check list – Nordyne Downflow Condensing Furnace M3RL User Manual

Page 35

Advertising
background image

35

UNIT MODEL NUMBER ________________

Minimum Clearances per Table 3? ________

Electrical Connections tight? _____________

Line Voltage Polarity correct? ____________

Supply Voltage: ___________________ Volts

Blower Motor HP: _____________________

FUEL TYPE:

Natural Gas ______

LP/Propane _______

Gas Piping Connections leak-tested? _____

Gas Line Pressure: ____________________
(in. water column, with furnace operating)
Manifold Pressure: ____________________
(in. water column, with furnace operating)
Is there adequate fresh air supply for
combustion and ventilation? _____________

Furnace Input: _________________ (Btuh)

Supply Air Temperature: __________ (° F)

Return Air Temperature: _________ (° F)

Temperature Rise: ______________ (° F)

UNIT SERIAL NUMBER ________________

Are Flue Connections tight? _____________

Is there Proper Draft? __________________

Is Vent free from restrictions? ____________

Is the Filter(s) secured in place? __________

Is the Filter(s) clean? __________________

Has the Thermostat been calibrated? _____

Is the Thermostat level? ________________

Is the Heat Anticipator Setting correct? ____

Has the Owner's Information been reviewed
with the home-owner? _________________

Has the Literature Package been left near the
furnace? ____________________________

LOCATION ____________________ CITY __________________ STATE ____________

INSTALLER ___________________ CITY __________________ STATE ____________

INSTALLATION/PERFORMANCE CHECK LIST

Advertising