Installation checklist – Rheem AP15121-1 User Manual

Page 11

Advertising
background image

Installation Checklist

11

A. Water Heater Location

Close to area of heated water demand.

❑ Indoors and protected from moisture,

wet conditions and freezing

temperatures.

❑ Area free of flammable vapors.

1,000 cu. ft unconditioned indoor space.

❑ Provisions made to protect area from

water damage.

❑ Sufficient room to service heater.

❑ Eight inches (8") of clearance from

ceiling to top of heat pump water heater

to allow for air circulation.

Access to condensate disposal.

B. Water Supply

Water heater completely filled with

water.

❑ Air purged from water heater and piping.

❑ Water connections tight and free of

leaks.

C. Relief Valve

Temperature and Pressure Relief Valve

properly installed and discharge line run

to open drain.

Discharge line protected from freezing.

D. Wiring

Power Supply voltage agrees with water

heater rating plate.

Branch circuit wire and fusing or circuit

breaker of proper size. (Minimum 30

amp breaker)

Electrical connections tight and unit

properly grounded.

❑ 10 gauge wire.

E. Condensate Lines

Condensate lines from heat pump

installed correctly.

❑ Condensate lines from heat pump run to

a suitable drain location.

Advertising
This manual is related to the following products: