DUAL INSTALLATION -
“Push Button” also activates Purasan -

PBS

Battery

3 amp

Fuse

Small post on CDS

to S2 and PBS

CDS

To toilet

positive (+)

Purasan Circuit Board

on T

reatment

tank

Freshwater Solenoid valve wiring

Battery

DUAL

INST

ALLA

TION

IMPORTANT:
• Dual toilet installations require either

independant operation of toilet and
treatment cycle or activation from the
toilet of the treatment cycle.

• Dual installations require only one

dispenser, water to fill dispenser MUST
be supplied using a freshwater solenoid.

WIRING
Switch Panel (2nd one)
1. Connect cable from Switch Panel to Circuit

Board as follows:
• S1 to S1 - red wire

• S2 to S6 - orange wire

• L1 to L1 - green wire

• L2 to L2 - white wire

• S4 to S4 - black wire

Toilet activation starts treatment cycle

Flushing toilet will activate treatment cycle.
Note: Toilet may be flushed as often as
necessary, do not exceed recommended flush
volume.
1. Mount Switch Panel near toilet.
CAUTION: Use only the Raritan #CDS

(failure to do so will damage to the Con-
trol Board, voiding warranty).

2. Run 16 ga. wire from small relay terminal

to S2 on Circuit board and one post of the
PBS (push button switch)

3. Run 16 ga. wire from small realy terminal

on second solenoid to S6 on Circuit board
and one post of the second PBS.

4. Wire freshwater solenoid see below.

Freshwater Solenoid valve wiring

1. Run 16 ga. wire from battery positive to one

of the wires on the solenoid with 3 amp fuse
in line.

2. Run 16 ga. wire from wire on solenoid not

used to H1 on Purasan Circuit Board.

PLUMBING

Follow installation instructions on page 8 and