Renesas SuperH HS0720KCU01HE User Manual

Page 32

Advertising
background image

26

Figure 2.1 [Source] Window at Execution Halted (Sequential Break)

If the sequential condition, performance measurement start/end, or point-to-point for the internal
trace is set, conditions of Event Condition to be used will be disabled. Such conditions must be
enabled from the popup menu by clicking the right mouse button on the [Event Condition] sheet.

Notes: 1. If the Event condition is set for the slot in the delayed branch instruction by the

program counter (after execution of the instruction), the condition is satisfied before
executing the instruction in the branch destination (when a break has been set, it occurs
before executing the instruction in the branch destination).

2. Do not set the Event condition for the SLEEP instruction by the program counter (after

execution of the instruction).

3. When the Event condition is set for the 32-bit instruction by the program counter, set

that condition in the upper 16 bits of the instruction.

4. If the power-on reset and the Event condition are matched simultaneously, no condition

will be satisfied.

5. Do not set the Event condition for the DIVU or DIVS instruction by the program

counter (after execution of the instruction).

6. If a condition of which intervals are satisfied closely is set, no sequential condition will

be satisfied.
• Set the Event conditions, which are satisfied closely, by the program counter with
intervals of two or more instructions.
• After the Event condition has been matched by accessing data, set the Event
condition by the program counter with intervals of 17 or more instructions.

Advertising