Installation – Trane YCZ036F1/3M0B User Manual

Page 10

Advertising
background image

Page 10

INSTALLATION

ROOFTOP -- UNITS

For roof top applications using a field fabricated frame and ducts,
use the following procedure:

1. The frame must be located and secured by bolting or welding

to the roof. Flashing is required.

2. The hole in the roof must be prepared in advance of installing

the unit.

3. Secure the ducts to the roof.

TYPICAL ROOFTOP APPLICATION WITH FRAME

(YCZ036,060F MODELS)

0

TYPICAL ROOFTOP APPLICATION WITH FRAME

(YCZ036,050,060F)

9

4. Place the unit on the frame or roof curb. Refer to Figures 9 or

10.

5. Secure the unit to the frame or roof curb.

6. Insulate any ductwork outside of the structure with at least two

(2) inches of insulation and then weatherproof. There must be
a weatherproof seal where the duct enters the structure.

7. Complete the installation according to the instructions in the

following sections of this manual.

ANGLE IRON

FRAME

SUPPLY AIR

ROOF FLASHING

WEATHER-PROOF

DUCT

RETURN AIR

ROOF FLASHING

FLUE

INLET HOOD

ROOF FLASHING

WEATHER-PROOF

DUCT

RETURN AIR

SUPPLY AIR

ANGLE IRON

FRAME

FLUE

INLET HOOD

Advertising
This manual is related to the following products: