Important – Twin-Star International 33EB304GRS User Manual

Page 6

Advertising
background image

JUNCTION BOX

1. Locate the voltage selector switch inside

the exhaust panel on the top left hand

corner of the unit. (see figure 2 on page 3)

2. Confirm the switch is set to 120 volt

configuration ( 115 volt is printed on

switch).

3. Loosen the screw securing the junction

box cover and remove the cover.

4. Remove the knockouts (if necessary)

or use a cable clamp (not provided).

5. Pull out the four wires marked L1, L2,

N, and G.

6. Connect the black L1 wire from the unit to

the black L1 from the power supply.

7. Connect the red L2 wire and the N wire

from the unit to the N wire from the

power supply.

8. Connect the green ground wire from the

unit to the ground from the power supply.

9. Ensure that all connections are tight.

10. Insert all the wiring back into the unit and

secure with a cable clamp.

Section 5: 120 Volt Installation Instructions

Important

• The unit is factory configured for 120 volt

operation.

• Use 2 conductor wire with ground (3 wires

total) from the power supply (breaker

panel) to the junction box on the unit.

• All wiring must be completed prior to

installing the unit.

• Ensure that the voltage selector switch is

in the proper position for the required

supply voltage prior to connecting the unit

to the power supply.

Junction Box Locator: Figure 6

E-6

Advertising
This manual is related to the following products: