Figure 4.2 test button validator, How autotest works validator, How autotest works – Test-Um VALIDATOR-NT NT955 User Manual

Page 55: Validator-nt

Advertising
background image

54

Test-Um NT955 Series
4.1. Cable Test Schedule

The Cable Test Schedule displays all the individual cable runs associated

with the open job. For your convenience when testing, you can sort each

field in the Cable Test Schedule in ascending or descending order. To

sort the Cable Test Schedule, move the highlight to a cell in the column

to be sorted and press the

SORT (F4) soft key. The column is sorted

first in ascending order. A second press sorts by descending order and

toggles between the two on subsequent presses.

To test a cable on the list, highlight the Cable ID you wish to test. Attach

that cable to the appropriate connector on the main unit. Attach the

remote unit to the other end of the cable you wish to test.

With the remote connected to the cable, the test function can be started.

Press

TEST (See Figure 4.2). You will hear relays switching in the main

unit and remote. A link is established with the remote, and Validator-NT

begins testing the cable to the parameters that have been defined for its

type. If it is network cable, Validator-NT will perform full Signal to Noise

Ratio and Skew testing as well as Speed testing with a Bit Error Rate

Test (BERT) in approximately 23 seconds.

6

MNO

JKL

5

4

GHI

*

7

PRS

0

#

9

TUV

8

QZ

WXY

MENU

1

ACCPT

TEST

3

ABC

2

DEF

SEL

QUIT

VALIDATOR-NT

TM

OPEN

RENAME

COPY

DEL JOB

Job Manager
Untitled1.job

Test-Um Inc.

validator

File Name

Modified

File Size

Test-um.job
Technicolor.job
Untitled1.job

10.21 Wed 2005 Oct 06
9.51 Fri 2005 Oct 08
10.00 Mon 2005 Oct 11

25.1 K
11.7 K
5.7 K

Magicworld.job

13.17 Tue 2005 Oct 05

13 K

100%

2005 Aug 25

10:53:01

Figure 4.2 Test Button

Validator

TM

How AutoTest Works

Validator

TM

How AutoTest Works

Advertising