4000000782_i450 instructions__pg33_en.pdf, Warning – The First Years VIA 1450 User Manual

Page 34

Advertising
background image

Section 7 - Installation and Use


1. Lower dry pad on shell allowing
the attachment flaps to remain
open.

2. Pull harness through open flaps.
Place harness in the harness
location slots.
Place harness to the side. .

3. Close flaps and secure with the
hook and loop fastener.

4. Fasten outer snaps, replace
Canopy Head Bolster.

Pad Installation- 7.15

WARNING

Prevent injury. Do not use

this Infant Carrier without the

pad

33

Advertising