UPS 225 - 275 kVA

User’s and Installation Guide

1027212
Revision B

3

Installation checklist

r

All packing materials and restraints have been removed from each cabinet.

r

Each cabinet in the UPS system is placed in its installed location.

r

A cabinet grounding/mounting kit is installed between any cabinets that are bolted

together.

r

All conduits and cables are properly routed to the UPS and any ancillary cabinets.

r

All power cables are properly sized and terminated.

r

Neutral conductors are installed or bonded to ground as per requirements.

r

Battery cables are terminated on E4 (+) and E5 (–).

r

Battery Shunt trip and Aux contact signal wiring is connected from the UPS to the battery

breaker.

r

LAN and telephone drops are installed.

r

All telephone and LAN connections have been completed.

r

A ground conductor is properly installed.

r

Air conditioning equipment is installed and operating correctly.

r

The area around the installed UPS system is clean and dust-free. (It is recommended that

the UPS be installed on a level floor suitable for computer or electronic equipment.)

r

Adequate workspace exists around the UPS and other cabinets.

r

Adequate lighting is provided around all UPS equipment.

r

A 230 Vac service outlet is located within 7.5 meters of the UPS equipment.

r

The Remote Emergency Power-off (REPO) device is mounted in its installed location and its

wiring is terminated inside the UPS cabinet.

r

The normally-closed (NC) Emergency Power-off contact (pins 1 and 2 on TB1) is jumpered if

not used.

r

Alarm relays and building alarms are wired appropriately. (OPTIONAL)

r

A remote battery disconnect control is mounted in its installed location and its wiring is

terminated inside the UPS and battery cabinet. (OPTIONAL)

r

Accessories are mounted in installed locations and wiring is terminated inside the UPS

cabinet. (OPTIONAL)

r

The debris shield covering the UPS cabinet ventilation grill is removed.

r

Startup and operational checks are performed by an authorized Eaton Customer Service

Engineer.