Installation of outdoor unit, Barriers in front and back of unit – Toshiba CARRIER RAV-SP240AT2-UL User Manual

Page 11

Advertising
background image

Toshiba

– 10 –

Outdoor Unit

Installation Manual

EN

Barriers in front and back of unit

Open above and to the right and left of the unit.
The height of an barrier in both the front and rear of the
unit, should be lower than the height of the outdoor
unit.

Standard installation

1. Single unit installation

2. Multiple unit installation

a. Intake and supply parallel

b. Intake and supply in line

Open above and to the right and left of the unit.
The height of an obstacle in both the front and
rear of the unit should be lower than the height
of the outdoor unit.

Standard installation

„

Installation of Outdoor Unit

• Before installation, check the strength and horizontal

of the base so that abnormal sounds do not
emanate.

• According to the following base diagram, fix the base

firmly with the anchor bolts.
(Anchor bolt, nut: 3/8” (M10) x 4 pairs)

1) Field fabricate a snow or an ice stand for the

unit using the above dimension.

2) Place snow or ice stand on a foundation/pad

and secure it to the foundation/pad and secure
it to the foundation/pad by anchor bolts.

5

.9” (1

50)

or

m

or

e

39.

4”

(1000)

or

m

or

e

11.8” (300) or more

11.8” (300)

or more

39.4

” (10

00)

or

more

7.9” (

200)

or mor

e

39.4”

(1000)

or more

11.8”

(300) or

more

59.1”

(1500)

or more

78.7”

(2000)

or more

7.9”

(200)

or more

Drain hole

Drain

nipple mounting hole

Drain hole

5.9” (150)

20.7” (525)

1.8” (45)

23.6” (600)

15

.8”

(

400

)

14.4”

(365)

5.9” (150)

NOTE

When the outdoor unit is anchored directly on
the foundation/pad (cooling only protrude a
minimum of 6” (15 mm)).

0.6” (15 mm) or less

10-EN

+00EH99865401_00Ta.book Page 10 Wednesday, November 25, 2009 11:19 AM

Advertising