Triple Evacuation Method chart

Final Tubing Check

IMPORTANT:

Check to be certain factory tubing on both indoor and
outdoor unit has not shifted during shipment. Ensure
tubes are not rubbing against each other or any sheet
metal. Pay close attention to feeder rubes, making sure
wire ties on feeder tubes are secure and tight.

Open service valves

Open or close the valve.

Liquid side

Open the valve with a 4 mm hexagon wrench.

Gas side

• While the valve is fully opened, after the screwdriver

has reached the stopper, do not apply torque
exceeding 4 ft•lbs (5 N•m). Applying excessive
torque may damage the valve.

Valve handling precautions
• Open the valve stem until it reaches the stop.

It is unnecessary to apply further force.

• Securely tighten the cap with a torque wrench.
• Cap tightening torque

EVACUATE

BREAK VACUUM WITH DRY NITROGEN

WAIT

EVACUATE

BREAK VACUUM WITH DRY NITROGEN

WAIT

EVACUATE

CHECK FOR TIGHT, DRY SYSTEM

(IF IT HOLDS DEEP VACCUM)

RELEASE CHARGE INTO SYSTEM

Valve size

Ø3/8” (9.5 mm)

24 - 31 ft•lbs (33 - 42 N•m)

Ø5/8” (15.9 mm)

15 - 18 ft•lbs (20 - 25 N•m)

Charge port

10 - 13 ft•lbs (14 - 18 N•m)

Valve unit

Charge orifice

Using a straight blade

screwdriver, turn it 90°

counter clockwise until

the valve is fully open

(against the stop).

Flare nut

Handle position

Fully closed

Fully opened

Stop pin

Main stopper

18-EN