The letter(s) in parentheses after each function described below, such as (A)
after ACTION, are those that appear in the various summary displays of
programmed data during programming.

ACTION (A)

The "ACTION" of the relay is how the relay will respond
when it is activated by the "START" programming. You
may want the relay to activate momentarily, to pulse on and
off continuously, or to remain activated until some other
event occurs to stop it. There are four different choices of
actions:

ACTIVATE for 2 SECONDS and then reset.

ACTIVATE and REMAIN ACTIVATED until stopped by
some other event.

PULSE ON and OFF until stopped by some other event.

NOT USED when the relay is not used.

START (STT)

The "START" programming determines when and under
what conditions the relay will be activated. The following
START options are available:

A)

1.

EVENT (EV) is the condition (Alarm, Fault, Trouble) that
must occur to a zone or group of zones (zone list) in order to
activate the relay. These conditions apply

only when a zone

list is used. The different choices for "EVENT" are listed
below and in the “Programming Output Relays” section that
follows.

• ALARM

Relay action begins upon any alarm in an
assigned zone in the zone list.

• FAULT

Relay action begins upon any opening or
short in an assigned zone in the zone list.

• TROUBLE

Relay action begins upon any trouble

condition in an assigned zone in the zone
list.

• NOT USED

Relay action is not dependent upon one of
the above events.

2.

ZONE LIST (ZL) is a group of zones to which the “EVENT”
applies in order to activate a particular relay. Note that
there are a total of 3 zone lists that can be programmed in
field

81 mode; when the selected EVENT (Alarm, Fault or

Trouble) occurs in any zone in the selected “Start” ZONE
LIST (1, 2, or 3), activation of the selected relay will
START.

B)

1.

ZONE TYPE/SYSTEM OPERATION (ZT). If a System
Operation, such as “DISARMING” or “ANY FIRE ALARM,”
is to activate the relay, the appropriate choice would also
be entered under the “ZONE TYPE” option. “ZONE TYPE”
is used independently of the “EVENT/ZONE LIST”
combination.
If a specific "ZONE TYPE" is chosen, any zone of that re -
sponse type going into alarm, trouble, or fault will cause the
relay to activate as selected in "ACTION.” If the same
“ZONE TYPE” is also chosen for the STOP programming,
any zone of that type that

restores will de-activate the relay.

If a "SYSTEM OPERATION" is chosen (e.g., End of Exit
Time), that operation will cause the relay to activate as
selected in "ACTION.” The different choices for "ZONE
TYPE" and "SYSTEM OPERATION" are listed in
“Programming Output Relays” later in this section, and in the
Programming Form.