Installation, Continued, Built-in firebox installation – Vanguard FBST User Manual

Page 9

Advertising
background image

www.desatech.com

105116-01D



Figure 5 - Minimum Clearance -

Front View

42" Min.

0" to Wood Floor

8" Min.

0" Min. Clearance to
Upper Frame/Wallboard

Ceiling

4" Min. from the Perpendicular
Side Wall to the Edge of Facial

1/2" Min. Clearance
to Combustibles

44

1

/

4

"

24"

Figure 6 - Minimum Clearance - Top View

Minimum clearances to combustibles are:

• Sides of outer casing

0" min.

• Drywall to sides and top of

0" min.

front face

• Ceiling to opening

42' min.

• Floor (see Minimum Wall

0" min.

and Ceiling Clearances, note C)

• Perpendicular walls

4' min.

Right and Left

• Distance to Facing Walls

36" min.

See Figures 5 and 6.

iNSTaLLaTiON

Continued

Mantel Clearances for Built-In
Installation

If placing custom mantel above built-in firebox,

you must meet the minimum allowable clearance

between mantel shelf and top of firebox opening

shown in Figure 7. These are the minimum allowable

mantel clearances for a safe installation. Use larger

clearances wherever possible to minimize the heating

of objects and materials placed on the mantel.

CAUTION: Do not allow the

vent-free gas log heater to touch

or extend beyond the firebox

screen.

If your installation does not meet the above mini-

mum clearances in Figure 7, you must:

• raise the mantel to an acceptable height,

OR

• remove the mantel.

Figure 7 - Minimum Mantel Clearances

for Built-In Installation

Supplied
Firebox Hoods
Must Be Used
at All Times

Wire-mesh

Screen

Firebox Top

Mantel Shelf

3"

6"

9

1

/

4

"

Combustible
Material 1

1

/

2

"

Max Thickness

Note: All vertical

measurements are

from top of fireplace

hood to bottom of

mantel shelf. These

minimum clearances

replace any other

recommended

clearances supplied

with your ANS Z21.11.2

approved gas logs.

Wall board or facing material
(above firebox) may be of
combustible material, including
decorative mantel ornaments
or other similar projections
off of the facing material.

Top Frame
(Combustible Material)

12" 15" 18"

Note: Do not
cover louver
openings.

7" Min.

BUILT-IN FIREBOx INSTALLATION

Built-in installation of this firebox involves installing

firebox into a framed-in enclosure. This makes the

front of firebox flush with wall. Optional perimeter

brass trim accessories are available (see Accessories,

page 18). The brass trim will extend past sides of

firebox approximately 1/2". This will cover the rough

edges of the wall opening. If installing a mantel above

the firebox, you must follow the clearances shown

in Figure 7. Follow the instructions below to install

the firebox in this manner.

1. Frame in rough opening. The firebox framing

should be constructed of 2 x 4 lumber or heavier.

Construct framing using dimensions shown in

Figure 8 and 9, page 10. It is recommended that

the framing be constructed first and the unit

be placed in position by removing the nailing

flanges from one side. After sliding the unit into

place, the outer most flanges may be replaced

and nailed to the framing on all sides before

applying the wallboard to the exterior framing.

Advertising