Electrical connections – Zanussi ZGF 692 CT User Manual

Page 21

Advertising
background image

21

Electrical Connections

Electrical Connections

Electrical Connections

Electrical Connections

Electrical Connections

Any electrical work required to install this hob should be

Any electrical work required to install this hob should be

Any electrical work required to install this hob should be

Any electrical work required to install this hob should be

Any electrical work required to install this hob should be
carried out by a qualified electrician or competent person,

carried out by a qualified electrician or competent person,

carried out by a qualified electrician or competent person,

carried out by a qualified electrician or competent person,

carried out by a qualified electrician or competent person,
in accordance with the current regulations.

in accordance with the current regulations.

in accordance with the current regulations.

in accordance with the current regulations.

in accordance with the current regulations.

THIS HOB MUST BE EARTHED.

THIS HOB MUST BE EARTHED.

THIS HOB MUST BE EARTHED.

THIS HOB MUST BE EARTHED.

THIS HOB MUST BE EARTHED.

Electrical Requirements

Electrical Requirements

Electrical Requirements

Electrical Requirements

Electrical Requirements
Any permanent electrical installation must comply with the latest I.E.E.
Regulations and local Electricity Board regulations. For your own safety
this should be undertaken by a qualified electrician, e.g. your local Electricity
Board, or a contractor who is on the roll of the National Inspection Council
for Electrical Installation Contracting (NICEIC).

The manufacturer declines any liability should these safety
measures not be observed.

This hob is designed to be connected to a 230 V 50 Hz AC electrical supply.

Before switching on, make sure the electricity supply voltage is the same
as that indicated on the hob rating plate. The rating plate is located on the
bottom of the hob. A copy is attached on
the back cover of this book.

The hob is supplied with a 3 core flexible
supply cord incorporating a 3 amp plug
fitted. In the event of having to change the
fuse, a 3 amp ASTA approved (BS 1362)
fuse must be used.
Should the plug need to be replaced for
any reason, the wires in the mains lead are
coloured in accordance with the following
code:

Green and Yellow

- Earth

Blue

- Neutral

Brown

- Live

1) Connect the green and yellow (earth) wire to the terminal in the

plug which is marked with the letter 'E' or the earth symbol
or coloured green and yellow.

2) Connect the blue (neutral) wire to the terminal in the plug which

is marked with the letter 'N' or coloured black.

!

!

!

!

!

FO 0390

Advertising