Inst allation – Zephyr EOT-E42ASX User Manual

Page 10

Advertising
background image

10

1. Pre-installation calculations

1" 3/8

K

C

(36" std)

P

S

H

a) Select a hood preference height P that is

comfortable for the user. (from 24” to 32“).

b) Calculate Hood height your installation H = K-C-P.

c) Confirm that H is within the range of min to max H

found for your model (see “Dimensions and

clearances” paragraph). If not adjust your

installation.

d) Calculate Chimney structure height S. Save this

calculation for use later in the installation.

Inst

allation

2. Preparation of mounting surface

Installing supports above ceiling drywall.

Ceiling

Template

Note: Take into consideration the hood depth; the

hood could be much deeper than the cooktop.

a. Mark center lines of cooktop or range on ceiling

above. Use centerlines marked on ceiling to position

the mounting template.

Note location of hood front (that indicated with a

printed arrow), side, and mounting holes indicated

on template.

Note: Remember that printed arrow on template

corresponds to front of the hood and consequently to

side where control panels will be located at the end

of installation)

b. Remove and save template. Cut and remove ceiling

drywall. Install suitable length 2" x 4" lumber

between joists to provide chimney mounting points

as shown above. Use template for dimensions and

required clearance.

Make sure to affix the added lumber firmly and level.

Consult a professional if you have difficulties or your

installation is unique. Consult template and

Figs.above.

K = Kitchen Height

C = Counter Height (36"

standard)

P = Prefered Height of Hood

Bottom above counter

(recommended 24”-32”)

H = Hood height your

installation

H = K – C – P

S = Chimney Structure

Height, your installation.

S = H – 1“ 3/8

Advertising
This manual is related to the following products: