Inst allation – Zephyr EOT-E42ASX User Manual

Page 13

Advertising
background image

13

www.zephyronline.com

d. Fasten the canopy with 11 screws from the

bottom.

Bottom

View

FRONT

FRONT

FRONT

12. Fix 6 nuts on the internal side of top duct covers

sections (squere slots) and fix each other with 6

screws (3 per side).

Rectangular

slots

Plan

diagram

top

sections

Nut

top

sections

Chimney

Structure

13. Install top duct covers assembly to the chimney

structure.

Fix with 2 screws.

Note: Upper Duct Cover may be placed upside down

to hide (or unhide) ventless slots.

Inst

allation

Advertising
This manual is related to the following products: