P-5 installing the expansion module, Installation of the expansion module, English – MITSUBISHI ELECTRIC MDT552S User Manual

Page 29: Mounting the sdi box on the monitor, Connection with sdi

Advertising
background image

English-25

English

P-5

Installing the expansion module

Carry out as necessary

SDI for long-distance connection

or multiple-monitor connection

1. Mounting the SDI BOX on the monitor

1. Turn off the main power switch of the monitor and

disconnect the power cord.

CAUTION:

Be sure to disconnect the power cord to prevent breakdown

and electric shock.

2. Unscrew 2 screws (a) and remove the handle.

Unscrew 7 screws (b) and remove the option cover.

(b)

(b)

(b)

(b)

(a)

(a)

NOTE:

Retain the option cover you have removed because it is

replaced when the SDI BOX isn’t mounted.

3. Install the option slot cover (accessory) using the 5 screws (b)

that you have removed in step 2.

(b)

4. Insert the SDI BOX (option) in the option slot and secure it

on the monitor using the 2 screws (b) that you have removed

in step 2.

Attach the handle using the 2 screws (a) that you have

removed in step 2.

(a)

(b)

CAUTION:

After installing the option slot cover, ensure that the SDI

BOX is positioned and oriented properly and then insert it

fully into the slot. The device may be damaged if installed in

an incorrect position and orientation.

2. Connection with SDI

There are two cases of connection.

1) Connection to one monitor

1. Connect the video device and the SDI BOX (option) using

an SDI cable (BNC) (commercially available).

NOTE:

A high-spec BNC cable capable of carrying SDI signal is called

SDI cable and distinguished from other BNC cables.

2) Connection to multiple monitors

1. After the connection made in 2-1) above, connect the

SDI OUT connector on the fi rst SDI BOX and the SDI IN

connector on the second SDI BOX using a commercially

available SDI cable (BNC).

NOTE:

The usable cable length (when SDI BOX (DP-1SDI-3G) is

mounted) is as follows:

• When one SDI BOX is connected: 100 m (3G-SDI)*

* Based on the result of the actual measurement using

the recommended cable. (Recommended cable: 1694A

made by Belden)

NOTE:

For the connection method and specifi cations of the SDI BOX,

see the catalog or operation manual of the SDI BOX.

Installation of the expansion module

Install the expansion module to the option slot of this monitor

following the precautions and procedures described in the

manual supplied with the module.

Examples of supported expansion modules:

• SDI BOX (DP-1SDI-3G)

• OPS-compliant computer (commercially available)

Recommended computer (commercially available):

ARK-DS220F-MTSA1E of Advantech Co., Ltd.

NOTE:

• Please contact module manufacturer for any compatibility

issues.

[Description]

Intel

®

OPS (Open Pluggable Specifi cation) is a standard

suggested by Intel Corporation regarding the interface between

the pluggable module mounted on monitors designed for digital

signage applications and the monitors.

Supported OPS features:

• DVI-D

• Power control

• UART

• USB

• Digital audio

• Analog audio

• DDC

NOTE:

When an expansion module is in the option slot, the monitor

doesn’t enter the sleep mode even when POWER SAVE in the

CONFIGURATION1 menu is set to ON. Even when other video

input is selected, the monitor doesn’t enter the sleep mode.

See pages 33 and 53.

Option cover

Handle

Option slot cover
(accessory)

SDI BOX (option)

Handle

Option slot

Advertising