Fig. 5.2

Instructions for shortening VEGACAP 35

VEGACAP 35 can be shortened by any
amount. Recompensation is not necessary
(see fig. 5.2)
If the measuring probes are shortened by
more than 0.5 m, an empty adjustment must
be carried out. The instructions can be found
under „4.2 Switching point adjustments/New
adjustment“.
• Loosen the outer set screw (8).
• Unscrew the lower part of the weight (7).
• Shift the upper part of the weight (1), the

four O-rings (2) and the isolating socket
(3) on the cable upward above the planned
cutting point.

• Remove the isolating sleeve (6) from the

terminal bush (4).

• Loosen the two set screws (5) on the termi-

nal bush (4) and pull out the cable.

• Shorten the electrode cable with a metal

cutting saw or a cutting-off wheel to the
requested length.

• Shorten the cable insulation by 60 mm with

a sharp knife.

• Push the terminal bush (4) onto the cable

(with the chamfered side first) with a rotat-
ing movement.
Make sure that the cable is flush with the
lower side of the terminal bush (4).

• Fasten the cable with the two set screws

(5).
Make sure that the screen of the electrode
cable has no contact to the inner steel
cable.

• Push the isolating sleeve (6) onto the termi-

nal bush (4).

• Slide the upper part of weight (1) back

against the lower part of weight (7) and
screw the two parts together.

• Secure the upper part of weight (1) with

the outer set screw (8).

• Carry out an adjustment. The instructions

can be found under "4.2 Switching point
adjustment“.

1

2

3

4

5

6

8

7

1 Upper part of weight
2 O-rings
3 Isolating socket
4 Terminal bush
5 Set screws
6 Isolating bushing
7 Lower part of weight
8 Set screw