5 switch-on phase – VEGA VEGASON 63 Profibus PA User Manual
Page 22
22
5 Connecting to power supply
VEGASON 63 • Profibus PA
28786-EN-130417
1
2
3
Display
1 2
I2C
Fig. 21: Connection compartment, double chamber housing
1 Spring-loaded terminals for voltage supply
2 Plug connector for VEGACONNECT (I²C interface)
3 Ground terminal for connection of the cable screen
I2C
1
1
2
Fig. 22: Wiring plan, double chamber housing
1 Voltage supply, signal output
5.5 Switch-on phase
After VEGASON 63 is connected to voltage supply or after voltage
recurrence, the instrument carries out a self-check for approx. 30
seconds. The following steps are carried out:
•
Internal check of the electronics
•
Indication of the instrument type, the firmware as well as the sen-
sor TAGs (sensor designation)
•
Status byte goes briefly to fault value
Then the current measured value will be displayed and the corre-
sponding digital output signal will be outputted to the cable.
1)
Connection compartment
Wiring plan
Switch-on phase
1)
The values correspond to the actual measured level as well as to the settings
already carried out, e.g. default setting.