3 wiring plan, 4 switch on phase, Internal check of the electronics – VEGA VEGAWELL 51 4 … 20 mA User Manual

Page 19

Advertising
background image

5

.3 Wiring plan

4

1

2

2

3

Fig. 6: Wire assignment, suspension cable

1

blue (-): to power supply or to the processing system

2

brown (+): to power supply or to the processing system

3

Shielding

4

Breather capillaries with filter element

1

2

+

1

2

3

4

5

6

1

2

3

4

5

6

Fig. 7: Terminal assignment VEGABOX 02

1

To power supply or the processing system

2

Shielding

3

)

5

.4 Switch on phase

A

fter connecting VEGAWELL 51 to power supply or after a

voltage recurrence, the instrument carries out a self-check:

l

I

nternal check of the electronics

l

4 … 20

mA output jumps to the failure signal

T

hen VEGAWELL 51 delivers a current of 4 … 20 mA to the

cable. The value corresponds to the actual level as well as to
settings already carried out, e.g. the factory setting.

3)

C

onnect screen to ground terminal. Connect ground terminal on the outside

of the housing as prescribed. The two terminals are galvanically connected.

Direct connection

Connection via
VEGABOX 02

VEGAWELL

51 • 4 … 20

mA

19

C

onnecting to power supply

32465

-

EN

-080604

Advertising