8 switch-on phase – VEGA VEGADIF 65 Profibus PA User Manual
Page 40
40
5 Connecting to power supply
VEGADIF 65 • Profibus PA
36129-EN-130417
1 2 3 4
3
4
1
2
5
Fig. 44: Connection of the sensor in the housing base
1 Brown
2 Blue
3 Yellow
4 White
5 Shielding
I2C
Display
1
1
2
5
6
7
8
Fig. 45: Wiring plan external electronics
1 Voltage supply
5.8 Switch-on phase
After VEGADIF 65 is connected to voltage supply or after voltage
recurrence, the instrument carries out a self-check for approx. 30
seconds. The following steps are carried out:
•
Internal check of the electronics
•
Indication of the instrument type, the firmware as well as the sen-
sor TAGs (sensor designation)
•
Status byte goes briefly to fault value
Then the current measured value will be displayed and the corre-
sponding digital output signal will be outputted to the cable.
2)
Terminal compartment for
sensor connection
Wiring plan external
electronics
Switch-on phase