4 level measurement – VEGA VEGABAR 82 Modbus and Levelmaster protocol - Operating Instructions User Manual
Page 20
Advertising
20
4 Mounting
VEGABAR 82 • Modbus and Levelmaster protocol
46294-EN-131107
3
1
2
Fig. 14: Measurement setup for process pressure measurement of liquids in
pipelines
1 VEGABAR 82
2 Blocking valve
3 Pipeline
4.4 Level measurement
Keep the following in mind when setting up the measuring system:
•
Mount the instrument below the min. level
•
Do not mount the instrument close to the filling stream or emptying
area
•
Mount the instrument so that it is protected against pressure
shocks from the stirrer
Fig. 15: Measurement setup for level measurement
Measurement setup
Advertising