4 proof test – VEGA VEGASWING 66 - transistor (NPN-PNP) With SIL qualification User Manual

Page 24

Advertising
background image

24

6 Setup

VEGASWING 66 • - transistor (NPN/PNP)

44951-EN-130805

Level

Switching sta-

tus

Signal lamp -

green
Voltage supply

Signal lamp -

yellow
Switching sta-

tus

Signal lamp

- red
Fault message

Failure of the

supply voltage
Mode max./min.

any

open

Fault

any

open

6.4 Proof test

To find out possible undetected, dangerous failures, a proof test must

be carried out in adequate time intervals to check the safety function.

It is the user's responsibility to choose the type of testing.
You will find further instructions in the Safety Manual.
The following options are available for carrying out the proof test:
1. Short interruption of the supply line to the sensor

Average coverage (detected errors)

2. Dismounting of the sensor and immersion in the original medium

High coverage (detected errors)

3. Filling of the vessel up to the switching point

High coverage (detected errors)

This test is valid if you cannot change the vessel filling or cannot

dismount the sensor.
Test without filling or dismounting the sensor

1. Separate the instrument briefly (>2 s) from voltage supply.

After switching on again, the instrument must take on the same

switching status.
If this is not the case, then there is a fault in the measuring sys-

tem.
Make sure the connected downstream devices are activated dur-

ing the function test.

2. Set the mode switch (min./max.)

Check if the switching status changes (signal lamp - switching

status). By doing so, you can check the function of the measuring

system.
If this is not the case, then there is a fault in the measuring sys-

tem.
Make sure the connected downstream devices are activated dur-

ing the function test.

You can find the coverage of the test in the Safety Manual.

1 Short interruption of the

supply line to the sensor

Advertising