VEGA VEGASWING 66 - transistor (NPN-PNP) With SIL qualification User Manual
Page 26
Advertising
26
6 Setup
VEGASWING 66 • - transistor (NPN/PNP)
44951-EN-130805
Make sure the connected downstream devices are activated dur-
ing the function test.
3. Fill the vessel up to the switching point.
Check if the switching status changes (signal lamp - switching
status). By doing so, you can check the function of the measuring
system.
If this is not the case, then there is a fault in the measuring sys-
tem.
Make sure the connected downstream devices are activated dur-
ing the function test.
You can find the coverage of the test in the Safety Manual.
Advertising