Banks Power Ford Trucks: (Diesel ’08 - 10 6.4L Power Stroke) Speed Control- SpeedBrake '08-09 For use with PowerPDA & Banks iQ User Manual

Page 15

Advertising
background image

97244 v.2.0

15

5.

Make sure the suction cup and the

mounting area on the windshield are
clean and dry. With the suction lever in
the up position, ensure the suction cup
is flat against the windshield, and then
push the suction lever down to secure
in place.
Connecting Banks iQ

6.

Locate the RJ12 cable (similar

to telephone connector) on your
SpeedBrake Wire harness connected
to the vehicle’s OBD II connector. See

Figure 11.

7.

Locate Banks iQ Bridge Module and

connect the RJ12 connector into the
Bridge Module. See Figure 12.

8.

Route the Banks iQ USB interface

cable on the Banks iQ Bridge Module to
reach the Banks iQ and connect it to the
left receptacle on the iQ.
NOTE: You may need to loosen or
remove dash panel or covers to install
the interface cable between dash crevice
or behind dash panels.

WARNING: THE CHARGING CABLE

CONNECTED TO THE BANkS iQ IS

DESIGNED TO SUPPLY A CONSTANT

LOW-VOLTAGE POWER SOURCE

(+5VDC) TO THE BANkS iQ AND IS

“LIVE” AS LONG AS THE SYSTEM’S

OBD II INTERFACE CABLE OR BANkS

WIRING HARNESS IS COMPLETELY

INSTALLED AND THE USB CABLE

CONNECTOR IS PLUGGED INTO

BANkS iQ. ALTHOUGH THIS

CHARGING CABLE IS SHORT AND

ITS CIRCUITRY IS FUSE-PROTECTED,

THE USER IS EXPECTED TO TAkE

APPROPRIATE MEASURES TO

PREVENT SMALL CHILDREN AND/

OR PETS FROM CONTACT WITH ANY

PART OF THIS SYSTEM.

9.

Secure Banks iQ Bridge Module

under the dash to any dash frame

support using the supplied cable ties.

Use the cable tie support loops on the

side of the Bridge Module to securely

fasten it under the dash.

10.

Route all wiring away from any

pedals or other moving components.

Using the cable ties supplied, secure

the wiring under the dash.

-END SEcTION 2-

Figure 10 Mounting location for Banks iQ

Advertising