3 traveling machinery assembly, 1 machinery sizes 3-5 – R&M Materials Handling WIRE ROPE PACKAGES User Manual

Page 21

Advertising
background image

R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319

21/76

R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.

3 Traveling machinery assembly

3.1 Machinery sizes 3-5

Pos. Name

Specification

Amount

1

End carriage

2

2

Washer

DIN125-A8-A3G (Machinery sizes 3 and 4)

DIN6796-A12-A3G (Machinery size 5)

8+8

3

Screw

DIN912-M8x85-8.8-A3G (Machinery size 3)

DIN912-M8x100-8.8-A3G (Machinery size 4)

DIN912-M12x140-8.8-A3G (Machinery size 5)

8+8

4 Traveling

machinery

2


• Clean splines and mounting flanges from dirt and rust protection wax and grease the shaft lightly

before assembly.

• You can use a plastic hammer to slide drive in. Do not use any metal or lead hammer.

• Tightening torques M8-8.8 23 Nm, M12-8.8 77 Nm.
• Remove the protection pin from the breather plug.

Advertising