2 joint plate assembly, underrunning end carriages – R&M Materials Handling WIRE ROPE PACKAGES User Manual

Page 51

Advertising
background image

R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319

51/76

R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.

10.2 Joint plate assembly, underrunning end carriages

Pos. Connection

Friction

rings

BA, BB, SA, SB

Bottom connection

Yes

Tightening torque

Screw size

Tightening torque

M16-10.9 280

Nm

M20-10.9 550

Nm


• Check that joint surfaces are free from dirt, dust and loose particles.

• Place friction rings around screw holes at bottom of end carriage.
• Place joint plate bottom of the end carriage. Make sure, that friction rings are kept in position

during assembly.

• Assemble screws and nuts.
• Assemble joint plate into final position and tighten screws with correct torque.

• Retighten screws after test runs at assembly site.

Advertising