4 crane towing arm assembly, 1 crane towing arm – R&M Materials Handling WIRE ROPE PACKAGES User Manual

Page 25

Advertising
background image

R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319

25/76

R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.

4 Crane towing arm assembly

4.1 Crane

Towing

Arm

13

11

7

8

12

14

4

9

3

10

1

5

6

2

15

c-vr-lb

Pos. Name

Specification

Fixing

variation

Amount

1

Towing arm

CQW-L558

A & B

1

2

Towing arm

CQP-L195W120H135

A & B

1

3

Tube

CQ-L1500W50H50T2

A & B

1

4

Fixing Plate

CQP-L80W80H6

A & B

4

5 Fixing

Plate

(option)

CQP-L150W105H6

B

1

6 C-Profile

(option)

CQP-L500W50H120

B

1

7

Screw

DIN933-M10x20-8.8-A3G

A & B

4

8 Screw

DIN933-M10x35-8.8-A3G

B

4

9

Screw

DIN931-M8x80-8.8-A3G

A & B

4

10

Screw

DIN931-M8x140-8.8-A3G

A & B

4

11

Washer

DIN125-A10-A3G

A / B

4 / 12

12

Washer

DIN125-A8-A3G

A & B

16

13 Nut

DIN985-M10-8-A3G

B

4

14

Nut

DIN985-M8-8-A3G

A & B

8

15 Towing

arm

(option)

*

CQP-L440W41H80

A & B

1

A)

Fixing variation with direct connection to end carriage. When conductor rail power supply type is used either part number 2 or its
fixing parts won’t be needed. It will not matter to the place of the end carriage where the towing arm is attached if the power supply
is flat cable- or the conductor rail type. The cranes towing arm is fixed by the part number 7 to the end carriage.

B)

Variation with the optional fixing part (part number 6).

• If necessary cut off excess length of square tubes.

• There will be several attaching possibilities in the end carriage for the towing arm. Choose the

best suited for the case.

• Notice the differences between variations in the part list.

*

For assembly use either Towing arm part no 2 or 15 (alternative parts).

Advertising