Table v-group b inspection mil-prf-38534 (pg 25), Table vi-group c inspection mil-prf-38534 (pg 26), Q-tech – Q-Tech CLASS B+ User Manual

Page 25: Class b+ products, Table v group b inspection, Table vi group c inspection

Advertising
background image

Q-TECH Corporation - 10150 W. Jefferson Boulevard, Culver City 90232 - Tel: 310-836-7900 - Fax: 310-836-2157 - www.q-tech.com

25 of 27

Q-TECH

CORPORATION

QPDS-0001, Rev L, June 2013 (ECO #10851)

CLASS B+ PRODUCTS

HIGH RELIABILITY HYBRID CRYSTAL CLOCK OSCILLATORS

2.5 to 5.0Vdc - 15kHz to 350MHz

Subgroup

Test Description

MIL-STD-883

Quantity / (Accept No.)

Method

Condition

1

Physical Dimensions

2016

-

2 (0)

2

Particle Impact Noise Detection (Note 2)

2020

B

15 (0)

3

Resistance to Solvents

2015

-

4 (0)

4

Internal Visual and Mechanical

2014

-

1 (0)

5

Bond Strength (Note 3)

2011

C or D

2 (0)

6

Die Shear Strength (Note 4)

2019

-

2 (0)

7

Solderability (Note 5)

2003

Solder Temperature: 245 ±5º C

1 (0)

8

Seal; Fine Leak and Gross Leak (Note 6)

1014

A

1

& C

4 (0)

9

ESD Classification (Note 7)

3015

-

4 (0)

QCI Per MIL-PRF-38534, CLASS K (Modified)

NOTES:

1. Non catastrophic screening test rejects may be used for Group B.

2. To be omitted. Being performed during screening, see Table I.

3. Subgroup 5 shall be performed in accordance with the Group B bond strength requirements of MIL-PRF-38534. This test may be

performed in-process anytime prior to cover seal.

4. Die shear test samples shall not be the same units as subjected to bond pull. Die shear specimens shall not be exposed to the 300ºC

preconditioning used for the bond strength test.

5. Solder temperature shall be 245 ±5ºC.

6. Subgroup 8, the fine and gross leak tests are being done during screening, see Table I.

7. Subgroup 9, the ESD classification test, is not required. The hybrid has been classified as ESDS Class 1 (i.e., Electrostatic voltage

= 0 to 1999V) and shall be marked accordingly.

Table V

Group B Inspection

(Note 1)

Subgroup

Test Description

MIL-STD-883

Quantity / (Accept No.)

Method

Condition

1

External Visual

2009

5 (0)

Temperature Cycling

1010

C, 20 Cycles

Constant Acceleration

2001

A, Y

1

Axis

Seal (fine & gross leak)

1014

A

1

& C

Radiographic Inspection

2012

Visual Examination
End Point Electricals

2

End Point Electricals

Steady State Life

End Point Electricals

1005

1000 hours at 125ºC

5 (0)

3

Internal Water Vapor Content

1018

3 (0) or 5 (1)

NOTES:

1. Five units shall be used for Group C inspection based on limited usage acquisition requirements of MIL-PRF-38534.

2. End point electrical shall be as specified in the detail specification.

3. Subgroup 1 specimens shall be used for subgroup 3 testing.

Table VI

Group C Inspection

Advertising