Option a (pg 9-10), Modified, Mil-prf-55310 – Q-Tech CLASS B+ User Manual

Page 9: Level s, See details in, Table ii, Q-tech, Class b+ products

Advertising
background image

Q-TECH Corporation - 10150 W. Jefferson Boulevard, Culver City 90232 - Tel: 310-836-7900 - Fax: 310-836-2157 - www.q-tech.com

9 of 27

Q-TECH

CORPORATION

QPDS-0001, Rev L, June 2013 (ECO #10851)

CLASS B+ PRODUCTS

HIGH RELIABILITY HYBRID CRYSTAL CLOCK OSCILLATORS

2.5 to 5.0Vdc - 15kHz to 350MHz

Test Description

MIL

Standard Method Condition Qty

Comments

Non Destructive Bond Pull

883

2023

100%

Except on ceramic packages

Internal Visual

883

2017

2032

Level B

100%

See 4.4.2 of MIL-PRF-55310

Stabilization Bake

883

1008

C

100%

48 hours at +150°C

Thermal Shock

883

1011

A

100%

Temperature Cycling

883

1010

B

100%

10 cycles

Constant Acceleration

883

2001

A

100%

Y1 direction only (5,000g’s)

Seal Fine and Gross Leak

883

1014

A1, C

100%

Particle Impact Noise Detection (PIND)

883

2020

B

100%

5 passes minimum

(see Note 1)

Pre Burn-In Electrical

Refer to Table II-a and Detail Specification

100%

Burn-In

883

1015

+125°C

for 240 hours

minimum

100%

With load and nominal supply voltage

Final Electrical

Refer to Table II-a and Detail Specification

100%

Percent Defective Allowance (PDA)

55310

PDA=2% (Supply Current only)

Radiographic Inspection

883

2012

Class S

100%

External Visual

883

2009

100%

Screening Option A (Modified MIL-PRF-55310, Level S)

(Example: QT188HCD10A-40.000MHz)

Parameters

Pre BI

at 25ºC

Pre BI

Low Temp

Pre BI

High Temp

Post BI

at 25ºC

Post BI

Low Temp

Post BI

High Temp

Output Frequency

Frequency/Temperature Stability

Frequency/Voltage Stability

Input current

Output Voltage

Waveform

Duty cycle

Rise and Fall Times

Start-up Time

Tristate Function (if applicable)

Table II-a

Electrical Test – Measurement Requirements

NOTES:

1. PIND testing shall be performed using five (5) independent passes and all failures found at the end of each pass are rejected. The

survivors of the last pass are acceptable.

2. 100% QCI Group A and Group B Inspections are performed. See table II-b

Table II

Back To Summary

Option A - Continue

Advertising