GE Industrial Solutions Power Break II Replacment Stop Block Kit User Manual

Page 2

Advertising
background image

5. Operate the charging handle four more times (for a total

of five, one less than the six needed to fully charge the

closing spring). If the closing spring does not charge, use

the following steps:

a. With a large screwdriver, put pressure on the end of

the closing spring, as shown in Figure 3 and Figure 4.

b. Maintain pressure with the screwdriver while

operating the charging handle one time.

c. Remove the screwdriver and operate the handle four

more times.

6. Install the spring assembly screw [1] with spacer [2] at

the end of the spring assembly, as shown in Figure 5

with the supplied

5

/

32

Allen Wrench tool [6].

7. Release the closing spring by pressing the close de-latch

lever with a screwdriver, as shown in Figure 6. Then

press the lever nearest the spring to release the breaker

mechanism, as shown in Figure 8.

8. Using a screwdriver pull the ratchet arm away from the

sprocket to allow for the shaft mechanism to rotate

freely (Figure 10). While holding the ratchet arm away

from the sprocket, press the spring against the stop

block as shown in Figure 11, then lift the front end of the

spring assembly up and out, as shown in Figure 12.

Figure 3: Applying pressure to the end of the closing spring.

Figure 4: Application point of screwdriver.

Screwdriver

[1, 2]

Figure 5: Installing the spring assembly screw.

Close De-latch

Lever

Figure 6: Pressing the close de-latch lever to release the

closing spring.

Advertising