Figure 15: Allen Screw to be loosened for Stop Block Removal

Figure 16: Screwdriver Placement for Deflection of Assembly

Wall

Figure 17: Removal of Stop Block Assembly

Tubin

g with
Collar

Figure 18: Stop block in position in breaker.

21. Replace the Electric Operator if previously removed by

securing with the long screws on the left side of the

spring assembly wall and the short hex screws on the

bottom of the spring assembly (Figure 23).

22. Operate the charging handle one more time to fully

charge the spring, then close and trip the breaker.

23. Operate the charging handle once and hold the handle

extended while reinstalling the breaker top cover, as

shown in Figure 2. Tighten the four #10-32 screws to 15

in-lb.

24. Replace the trim plate, if present, and tighten the four

#8-32 mounting screws to 20 in-lb.

25. Operate the charging handle until the spring is

completely charged. Close and trip the breaker.

26. Return the breaker to operation.