In figure 8, Figure 10). while hol, N in figure 11 – GE Industrial Solutions Power Break II Replacment Stop Block Kit User Manual

Page 3

Advertising
background image

Figure 7: Illustration of Bolt on Handle Side of Assembly

Wall

Figure 8: Releasing the breaker mechanism.

Figure 9: Secondary Connections Piece to be Removed Before

Electric Operator

Figure 10: Illustration of ratchet arm being pulled away from

sprocket

Front Bolt

Figure 11: Pressing the spring assembly to allow removal.

Rear Bolt

(Not Present with

Electric Operator

9. If the Electric Operator is installed on a stationary

breaker it must be detached before the Stop Block is

replaced. First remove the gray plastic secondary

connection piece from the left side of the breaker (Figure

9). Remove the two long Phillips screws and external

tooth lock washers from the left side of the Electric

Operator (Figure 22 & Figure 23) with a #3 Phillips

screwdriver.

10. If working on the stationary model, support the Electric

Operator with your hand so it does not fall following the

next step. Remove the two smaller hex screws and split

lock washers from the silver bottom plate that secures

the Electric Operator to the assembly walls (Figure 23).

The Electric Operator may now be set-aside without

disconnecting the electric snap connections. The Draw-

out model only requires that the electric operator be slid

to the left slightly allowing for a

7

/

16

wrench to access

the bolt on the side of the assembly wall (Figure 21 &

Figure 22).

11. Remove the front and rear bolts that secure the stop

block to the left side of the spring assembly wall (Figure

11), and the bolt securing the stop block assembly to the

Advertising