handle side of the assembly wall (Figure 10). If Electric

Operator is installed, then only the front and handle side

bolts will need to be removed because the rear bolt will

not be installed.

12. Loosen any screws on the front face of the accessories

(Figure 13) until the screws are fully loosened from the

housing, and then loosen the ¼-in setscrews located on

the side of the shunt trip guide housing (Figure 14). This

will allow the guide housing and accessories to be

removed.

13. Using the supplied

5

/

32

Allen Wrench [6], unscrew the

long bolt (BH HEX SKT

1

/

4

-20 X 3.56 SCREW) located on

the structure as seen in Figure 15 from the stop block

but it is not necessary to fully remove from the Spacer

Side Frame Pin tubing with collar that it passes through.

14. Wedge a flat head screwdriver between the spring

frame bearing and shaft and then rotate 90 degrees in

order to deflect the left side of the spring assembly wall

outward (Figure 16) to allow for the removal of the stop

block (Figure 17).

15. Discard the currently installed stop block, replace with

the new stop block assembly [3], and secure with the

three new Bolts with nylon patch [4] with Steel Spring

Lock Washers [5] on each to 65 inch-pounds min. For

models with the Electric Operator only replace the front

and handle side bolts. Ensure that the holes in the new

stop block align with the screw holes in the assembly to

avoid installing the new stop block incorrectly. Looking

at the block with the stop block gasket facing down,

there should be three holes on the left side of the stop

block and two holes on the right side.

16. Screw in the long bolt as seen in Figure 15 with a

5

/

32

Allen Wrench [6] to 90 inch-pounds min., and secure the

Shunt Trip guide casing and unit back into place.

17. Align the charging spring back in position, as shown in

Figure 8.

18. Operate the breaker-charging handle five times.

Remove the spring assembly screw [1] and spacer [2]

from the end of the spring.

19. Press on the close de-latch lever with a screwdriver,

rotating it clockwise as seen from the handle side of the

breaker, as shown in Figure 19. Then, with another

screwdriver, rotate the close de-latch mechanism to

release the charging pawl.

20. Rotate the trip de-latch lever fully back against the

frame, as shown in Figure 20, while pressing down on

the cradle to release the closing mechanism. While

holding the cradle down, rotate the spring forward

against the stop block.

Figure 12: Spring Removed Up and Out of Assembly.

Shunt Trip Screw

Figure 13:Shunt Trip Screw to be Unscrewed

Figure 14: 2 Setscrews

¼-in Setscrews