Data sheet, Post solder cleaning and drying considerations, Emc considerations – GE Industrial Solutions EBDW020A0B Barracuda Series User Manual

Page 14

Advertising
background image

GE

Data Sheet

EBDW020A0B Barracuda™ Series; DC-DC Converter Power Modules

36-75Vdc Input; 12.0Vdc, 20.0A, 240W Output

April 15, 2013

©2012 General Electric Company. All rights reserved.

Page 14

Post Solder Cleaning and Drying
Considerations

Post solder cleaning is usually the final circuit-board assembly
process prior to electrical board testing. The result of
inadequate cleaning and drying can affect both the reliability

of a power module and the testability of the finished
circuit-board assembly. For guidance on appropriate soldering,
cleaning and drying procedures, refer to GE Board Mounted
Power Modules: Soldering and Cleaning
Application Note
(AP01-056EPS).

EMC Considerations

The circuit and plots in Figure 25 shows a suggested
configuration to meet the conducted emission limits of
EN55022 Class B. For further information on designing for EMC
compliance, please refer to the FLT007A0Z data sheet.



Figure 25. EMC Considerations.

0

10

20

30

40

50

60

70

80

Level [dBµV]

150k

300k

500k

1M

2M

3M

4M 5M

7M

10M

30M

Frequency [Hz]

+

+

+

+

+

+

x

x

x

x

x

x

x x

MES CE0916111952_fin QP

+ +

MES CE0916111952_fin AV
MES CE0916111952_pre PK
MES CE0916111952_pre AV

Advertising