Powervac, 5kv vertical lift chapter 4. installation – GE Industrial Solutions PowerVac 5kV VL PV VL 4.16-250-0 User Manual

Page 15

Advertising
background image

15

Figure 9. Primary contact penetration and wipe

PowerVac

®

5kV Vertical Lift

Chapter 4. Installation

Final

Position

1/2” to 5/8”

Electrical

Wipe

Initial

Electrical

Contact

3/4” to 7/8”

Travel

3000A Contact

Wipe area should

be a minimum of

60% contact width

1200A & 2000A

Contact Wipe

should be a line

1/16” to 1/8”

wide.

(grease wipe)

8 3/16 M 26 9 3/4 M 36

12 3/4 M 36HH

Advertising