PowerVac

®

5kV Vertical Lift

Chapter 11. Mechanical Adjustments

Figure 40. Adjustment of MOC Switch/Plunger Interlock

P G R

Plunger
Interlock Gap between top of plunger interlock and Resulting travel of the aux.
Travel bottom of aux. switch rod switch rod
(To be
measured) Min. Max. Min. Max.

1-1/16 .001 1/16 1” 1-1/16

Adjustment of Plunger Interlock - Breaker raised to connect position. Gap adjustment as

a function of breaker plunger travel to assure proper switch operation.