Powervac – GE Industrial Solutions PowerVac 5kV VL PV VL 4.16-250-0 User Manual
Page 41
Advertising
41
PowerVac
®
5kV Vertical Lift
Chapter 11. Mechanical Adjustments
Figure 40. Adjustment of MOC Switch/Plunger Interlock
P G R
Plunger
Interlock Gap between top of plunger interlock and Resulting travel of the aux.
Travel bottom of aux. switch rod switch rod
(To be
measured) Min. Max. Min. Max.
1-1/16 .001 1/16 1” 1-1/16
Adjustment of Plunger Interlock - Breaker raised to connect position. Gap adjustment as
a function of breaker plunger travel to assure proper switch operation.
Advertising