Table #1 measurements, Powervac – GE Industrial Solutions PowerVac 5kV VL PV VL 4.16-250-0 User Manual

Page 43

Advertising
background image

43

TABLE #1 MEASUREMENTS

CLOSING

OPENING

ITEM

BREAKER

SPRING

SPRING

MEASUREMENT

Contact

Open

Charged

Discharged

Measure the stem or between

Wipe

Closed

Charged

Charged

spring block and nut

Contact

Open

Charged

Discharged

Measure the travel of the

Gap

Closed

Charged

Charged

operating rod insulator

Contact

Trip

Closed

Discharged

Charged

Measure between plunger

Coil

button and coil housing

Close

Open

Charged

Discharged

Measure under the collar

Coil

to the end of plunger

Control

Open

Discharged

Discharged

Depends on switch type

Switches

See Chapter 8

Timing

See Chapter 10-10

Contact

See Figure 26

Speeds

Motor
Cutoff

See Figure 47

Switch

PowerVac

®

5kV Vertical Lift

Chapter 11. Mechanical Adjustments

TABLE #2 ADJUSTMENTS

CLOSING

OPENING

ITEM

BREAKER

SPRING

SPRING

MEASUREMENT

Contact

Closed

Charged

Charged

Adjust operating rod to obtain

Wipe

required dimensions

Contact

Open

Charged

Discharged

Use buffer shims to advance

Gap

or retard gap adjustment

Contact
Erosion

Trip

Closed

Discharged

Charged

Turn adjusting nut to obtain

Coil

required dimension

Close

Open

Charged

Discharged

Loosen set screw and

Coil

move collar up or down

Control

Open

Discharged

Discharged

Adjust link

Switches

Motor
Cutoff

See Figure 47

Switch

Measure distance from bottom of

insulated operating rod to bottom

of stainless steel interrupter

support

Erosion

Replace interrupter when

wear exceeds 0.125”

Advertising