Installing the phase sensors, Parts provided for ct installation per pole, Ct post mounted in the breaker back frame – GE Industrial Solutions ProTrip Conversion Kits AK-1-50 User Manual

Page 7

Advertising
background image

Installing the Phase Sensors

Figure 5 shows the parts provided for assembly of the CT
on each pole.

1. Mount the new copper CT post to the back frame

with the two

3

/

8

-16 x 1

1

/

2

" bolts, flat washers, and

lock washers provided, as shown in Figure 6.

2. Fasten the three small insulated wire fasteners to the

back frame with the

1

/

4

-20 x 1

3

/

4

" screws provided,

as shown in Figure 7. One fastener is mounted under
each CT.

3. Place a CT over each copper post, first applying a

small amount of RTV or similar adhesive to prevent
the CTs from rotating.

4. Mount the top copper bus over each CT and secure

with the

1

/

2

-13 x 1

1

/

2

" Allen-head bolts, lock washers,

and flat washers provided.

5. Insert two

3

/

8

-16 x 1

1

/

2

" bolts, lock washers, and flat

washers through each top copper bus into the
contact arm assembly.

6. Tighten the

3

/

8

-16 bolts to 200 in-lb and the

1

/

2

-13

bolts to 300 in-lb.

WARNING: Step 6 ensures critical electrical integrity
connections. The designated bolts must be correctly
tightened for proper operation. Failure to tighten these
bolts properly will cause a breaker failure, resulting in
property damage and/or personal injury.

Figure 5. Parts provided for CT installation for one pole.

Figure 6. CT post mounted in the breaker back frame.

Figure 7. CT installation completed..

7

Advertising