GE Industrial Solutions WattStation Pedestal EVSE Charger Installation User Manual

Page 11

Advertising
background image

WattStation Pedestal Installation Manual

1111

G

GEE EEnneerrggyy

©

©22001122 G

GEE C

Coom

mppaannyy AAllll RRiigghhttss RReesseerrvveedd


SStteepp 66 :: Using provided template locate the 4 holes.
See figure 2 for reference. Template must be
Removed after locating the holes








SStteepp 77:: Using a hammer drill and carbide tipped
drill bit, drill a hole (1/2” diameter) and at least
5 ½” to 6” deeper, see figure 3 for reference.





SStteepp 88:: Repeat step 7 for all remaining holes


SStteepp 99:: Clean out hole of all debris


SStteepp:: 1100 Install EVSE unit securely over Concrete
bed keeping conduits in center with four ½”-6”
anchor bolt holes on EVSE baseplate aligned
with concrete bed holes.
Check local codes to ensure compliance.
See figure 4 for reference.






FFiigguurree –– 22


FFiigguurree –– 33


FFiigguurree –– 44

Advertising