GE Industrial Solutions WattStation Pedestal EVSE Charger Installation User Manual

Page 15

Advertising
background image

WattStation Pedestal Installation Manual

1155

G

GEE EEnneerrggyy

©

©22001122 G

GEE C

Coom

mppaannyy AAllll RRiigghhttss RReesseerrvveedd






SStteepp 1188:: Connect L1 and L2 to the
PDB – Power Distribution Block
and ground wire to the ground
lug shown in Figure 10.













SStteepp 1199:: The CAT5 cable is connected to the
Ethernet port. It is recommended to run 2
CAT5 cables if there are future or current
plans to support communication daisy
chaining of GE WattStation Pedestals



C

Caabbllee rreeeell




1.

Cable should not be extended beyond the red indicator line at the end of the cable.

Pulling beyond

this indicator

may cause the cable reel to bind, prohibiting retraction

.

2.

If

cable becomes bound due to over-extension, the following steps must be followed to retract the cable before

returning to normal operation

[2.1] Turn off the power

[2.2] Open the access door

[2.3]

Manually r

otate the cable

reel

in

a

counter-clockwise direction

until the cable is fully retracted.

[[22..44]] PPoow

weerr uupp tthhee uunniitt

aass nnoorrm

maall,, uunniitt

ccaann bbee rreettuurrnneedd ttoo nnoorrm

maall ooppeerraattiioonn


FFiigguurree -- 1100


FFiigguurree -- 1111