Installation Requirements
-
Ensure that a dedicated circuit, capable of supplying 30A at 208-240 VAC, is available
-
A recommended 40A upstream circuit breaker, located either in a panel board or load center,
should be used.
-
GE WattStation EVSE unit has built in GFCI protection; do not provide any additional GFCI
protection upstream of the EVSE.
7
Torque Specification Table
SSC
CRREEW
W SSIIZZEE
TTO
ORRQ
QU
UEE
TTO
ORRQ
QU
UEE TTO
OLL..
PDB – Power Distribution Block for
Field Wiring
40 in-lb
+/- 2 in-lb
Ground lug
45 in-lb
+/- 2 in-lb
Roller –M5x12, Cup Point set screw
18 in-lb
+/- 2 in-lb
Brush – T-15 Driver size
(Tamperproof Head)
23 in-lb
+/- 2 in-lb
Brush bracket – M5 Hex Head
23 in-lb
+/- 2 in-lb
Bellows bracket top – M5 Philips Head
23 in-lb
+/- 2 in-lb
Bellows bracket bottom – M5 Philips Head
23 in-lb
+/- 2 in-lb
Bellows plate – M3 Nut
18 in-lb
+/- 2 in-lb
Wire trays top – M5 Hex Head
23 in-lb
+/- 2 in-lb
Wire trays bottom– M5 Hex Head
23 in-lb
+/- 2 in-lb
Anchoring bolts – ½” x 6” Hex Head
20 in-lb
+/- 2 in-lb
TTaabbllee 11
W
WaattttSSttaattiioonn sshhoouulldd bbee iinnssttaalllleedd oonnllyy bbyy aa lliicceennsseedd ccoonnttrraaccttoorr,,
aanndd//oorr aa lliicceennsseedd eelleeccttrriicciiaann iinn aaccccoorrddaannccee w
wiitthh aallll aapppplliiccaabbllee
ssttaattee,, llooccaall aanndd nnaattiioonnaall eelleeccttrriiccaall ccooddeess aanndd ssttaannddaarrddss..
WARNING: