Installation and maintenance tools, Installation tools, Maintenance tools – GE Industrial Solutions WattStation Pedestal EVSE Charger Installation User Manual

Page 9: Field cable size, 8installation and maintenance tools, 9field cable size

Advertising
background image

WattStation Pedestal Installation Manual

99

G

GEE EEnneerrggyy

©

©22001122 G

GEE C

Coom

mppaannyy AAllll RRiigghhttss RReesseerrvveedd

8

Installation and Maintenance Tools

8.1

Installation Tools

TTyyppee

C

Chhaarraacctteerriissttiiccss

Slotted Screwdriver

3/16” or ¼”

Socket/Ratchet

Socket sizes: M5

Electric Hammer Drill

Wire stripper, hammer, wrench and anchor bolts*

TTaabbllee 22


* Use 1/2” x 6” Hexagonal Sleeve Anchor bolts


8.2

Maintenance tools

TTyyppee

C

Chhaarraacctteerriissttiiccss

Slotted Screwdriver

3/16” or ¼”

Drill Bit

T-15

Socket/Ratchet

Socket sizes: M3, M5

TTaabbllee 33





9

Field cable size




PPoow

weerr w

wiirreess::

Cu: 8 AWG

,

minimum 75 ° C wires

G

Grroouunndd w

wiirreess

Cu: 8 AWG, minimum 75 ° C wires

C

Coom

mm

muunniiccaattiioonn w

wiirreess

CAT5 Ethernet cable

W

WAARRN

NIIN

NG

G:: Make sure power to

the EVSE is disconnected before
performing any task

Advertising