INSTALLATION:

Before attempting installation, make sure that the pre-installation requirements of this manual

have been satisfied. If the status of the pre-installation requirements are not known, do not

attempt to continue.

1.

MOUNTING

The

GE Tranquell Wall Mounted SPD must be installed as close to the protected circuit as

possible. Long power cable runs between the SPD and protected circuit will result in

significantly reduced performance.

Select a mounting location that will allow for a minimum length of wire between the SPD and

the power terminals of the electrical service panel. The SPD can be mounted in any

orientation, however special consideration should be given to allow for periodic inspection of

the diagnostic display panel. The SPD should be mounted to a secure structure or surface.

On Flush-mount installations, reinforcement of drywall-and-stud wall construction may be

necessary to provide a secure mounting surface for the SPD unit. An example of a typical

flush-mount mounting arrangement is shown on page 16.

WARNING

POWER MUST BE PROVEN DISCONNECTED BEFORE STARTING

INSTALLATION, INSPECTION OR MAINTENANCE. FAILURE TO

DO SO MAY CAUSE SERIOUS INJURY, DEATH AND/OR

PROPERTY DAMAGE.