Installation guide, Data output, Blink codes for status led – GE Industrial Solutions ASPMETER Install User Manual

Page 3: Commissioning, Aspmeter

Advertising
background image

TM

ASPMETER

INSTALLATION GUIDE

Z206024-0B

PAGE 3

©2011 For technical support please contact

10111

DET-756

our GE tech support team at 1-800-GE-1-STOP (1-800-431-7867)

DATA OUTPUT

Monitoring at Mains

ASPMETERA ASPMETERB ASPMETERC

Current per phase

Max. current per phase

Current demand per phase

Max. current demand per phase

Energy (kWh) per phase

Real Power (kW) per phase

Apparent Power (kVA)

Power factor total *

Power factor per phase

Voltage - L-L and average

Voltage - L-N and average

Frequency (phase A)

Monitoring at Branch Circuit

Current

Max. current

Current demand

Max. current demand

Real power (kW)

Real power (kW) demand

Real power (kW) demand max.

Energy (kWh) per circuit

Power factor

Apparent Power (kVA)

Modbus Alarms

Voltage over/under

Current over/under

* Based on a 3-phase breaker rotation.

BLINK CODES FOR STATUS LED

Color and Pattern

Status Description

Green, once per second

Normal operation

Amber, once per second

Volts or Amps clipping

Amber, twice per second

Invalid firmware image

Amber, three per second

Incorrect strips or strip order

Red, solid or blink

Device Failure

COMMISSIONING

1. Install according to instructions in Appendix A.

1. Provide control power to main circuit board.

2. Configure installation mode using Modbus Register 6.

3. Configure CT scaling.

4. Configure alarms.

5. Configure demand.

Download the free E3x Configuration Tool from www.veris.com to commission the
ASPMETER for operation. (Click path: www.veris.com >> “Design Resources” >>
“Protocol Info” >> “Modbus” >> “E3x Configuration Tool”)