Figure 4. Installation of SCOM1A

Install the E150 circuit breaker in the panel with two #8-

32 x 2

3

/

4

" screws [19] on the line end of the circuit

breaker.
Place the spacers [15] into the counterbore on the load

end of the E150 breaker mounting holes. With the

breaker in the OFF position, place the breaker operating

mechanism [16] on top of the breaker cover with the

breaker handle extending through the mechanism pivot

plate. Secure the operating mechanism to the breaker

on the line side with two thread-cutting screws [17].

Secure the operating mechanism and the circuit breaker

on the load side to the panel surface with two #8-32 x 4"

screws [18].

Figure 5. Installation of SCOM1EF

Install an SE150 circuit breaker in the panel with four

#8-32 x 2

3

/

4

" screws [24]. Install an SF250 circuit

breaker in the panel with four #12-24 x 3

3

/

4

" screws

[25].
Thread the spacers [20] into the counterbore (

5

/

16

"-dia.

holes) on the load end of the SE150 or SF250 circuit

breaker. Remove the two breaker cover screws on the

line end of the breaker, as shown, and discard. With the

circuit breaker in the OFF position, place the breaker

operating mechanism [21] on top of the breaker cover

with the breaker handle extending through the

mechanism pivot plate. Secure the operating

mechanism to the breaker line side with two 3.5 x 10

mm metric screws [22]. Secure the mechanism on the

load side with two #8-32 screws [23], threading them

into the spacers [20].

Figure 6. Installation of SCOM1G

1. Mount the circuit breaker to the panel using the

four special mounting bolts [28]. Thread size is

#10-32.

2. Secure the mechanism to the breaker using four

#10-32 screws [27], lock washers [33], and flat

washers [34].