Breakmaster load interrupter switch – GE Industrial Solutions BreakMaster Load Interrupter Switch User Manual

Page 13

Advertising
background image

12

Step 4: Hinge Contact Pressure Adjustment

Open the switch until the arcing blade just clears
the arc chute. Connect a spring scale to the main
blades approximately 1

1

2

” below the jaw contact.

Some switches are equipped with a spacer just
below the jaw. This provides a convenient point to
connect the scale. On other switches, use a “tee”
adapter allowing equal force on both blades. See
Figures 11, 12, and 13.

A force of 2 - 4 pounds should be necessary to
move the blades. Loosen or tighten the hinge bolt
as necessary to meet the 2 - 4 pound requirement.

Step 5: Jaw Contact Pressure Adjustment

Close each switch pole and connect a spring
scale as described in Step 4. A force of 30 - 36
pounds should be necessary to open the switch
blades. Loosen or tighten the jaw contact bolts
as necessary to meet the 30 - 36 pound require-
ment. See Figures 11, 12, and 13 for spring scale
placement.

Pull 30 to 36 pounds

Scale 50-pound range

Aluminum Bar

Scale Hook

Switch Blades

600A Switches

Figure 11

Figure 12

Pull 30 to 36 pounds

Scale

Adapter

Switch Blades

Figure 13

NOTE

If the nylon insert locknut is removed

for any reason, it must be replaced

with an "ESNA" stopnut.

NOTE

Spring scale referenced in Steps 4 and 5 should

be Chatillon model# IN-10MRP for force range

10 lbs. 4 oz. or Chatillon model# IN-50MRP for

force range 50lbs. 8oz. or equivalent.

BreakMaster Load Interrupter Switch