15

5.2

Fuse Replacement Steps

1. All upstream devices that could energize the fuse should be opened, padlocked, and tagged so that

inadvertent closure cannot create a hazard.

2. The BreakMaster switch is opened by rotating the handle downward.

3. Before opening the door look through the viewing window to visually verify that all blades are disengaged from

their stationary contacts. Use a flashlight if necessary.

4. After opening the door, an appropriate medium voltage-sensing device, such as a TIC tracer rated up to 15kV,

should be used to determine if voltage is present. An example would be TIC brand, TIF320HV.

5. If no voltage is present, a suitable grounding device should be attached to the fuse terminals to discharge any

static charge and assure that the fuse terminals remain at ground potential.

6. Remove fuse by pulling fuse forward until it is clear of the fuse clips. Install new fuse by inserting it into the fuse

clips. Make sure the clips fully contact the fuse ferrules. See Figures 16 and 17.

DANGER

When accessing fuses, failure to assure that the fuses are deenergized may result

in equipment damage, bodily injury or death.

Make sure that all power sources are deenergized before attempting to

access the fuses.

!

Figure 16
Installed Fuses

Figure 17