Guidelines
•
The ES671 DC/DC Converter is installed in the left-most slot of the
ED83143-30 panel.
•
A single converter may be used in multiple panels in multiple
plants since the use of the OLE function is limited to a regular
maintenance schedule, and it is desirable that no more than one
battery string section per plant be taken off line at any given time.